QTY |
FOB PRICE |
CIF PRICE
QUANTITY
-
+
PCS
TOTAL COST
$1660Processing customization : No,*661109479569,Other,Qualified products,Other,Other,See description,See description,See description,10 copies of settlement documents for mechanical construction team,Mechanical construction team statement triple 10 copies,Crane construction team statement 2 copies 10 copies,10 copies of crane construction team statement,Excavator construction statement two copies 10.,Excavator construction statement triple 10 copies,10 copies of two copies of work order signed on site,10 copies of work order signed on site,White,Roller man-hour sheet, two copies, 10 copies,Roller man-hour sheet triple 10 copies,No |
Material : Default |
Pcs/Carton : N/A | Packing Size/Carton : N/A | Packing Vol/Carton : N/A |
N.W./Carton : N/A | G.W./Carton : N/A | QTY in 40HQ : N/A |
QTY in 40GP : N/A | QTY in 20GP : N/A |
支持一件代发,有问题联系旺旺客服!!!
• Amanbo Return Policy applies to all orders on amanbo.com.
• If products are not as described, returns are accepted and return shipping fee should be paid by buyer.
• If products are as described, seller has the right to refuse return. Buyer should pay return shipping fee if return require is insisted on.